arrow80

Skyaviations ARF Arrow

arrow header new

Bauthread:

12.Oktober 2017 Update!

Hier sehen Sie die Konstruktionsfortschritte dieses außergewöhnlichen Projektes.

30.September 2017

Baubericht von Todd Blose / U.S.A.

I just received the 1st Arrow ARF from Sky Aviations and I am happy to say it looks very impressive. The covering on the wings and stabs are first class and the fit to the fuse is great. It looks like the wait for the fiberglass fuselage will be well worth it and the glow version comes with added carbon fiber in the glass at the nose and wing sections for added strength. The fuse is very strong and painted in the mold and has a removal top hatch / pipe bay. I will show the weights below but it looks like this plane should come in around 8 to 81/2 lbs. on glow.

Sky Aviations will also offer an electric version that will also have the fiberglass fuselage but will not have the added carbon fiber in the nose and wing sections. I really believe that the glow version does not need it either since the fuse is so ridged. Over the next week Danny Jackson and I will be doing the build thread and getting info back to Sky Aviations on some instructions for the new Arrows that will be shipped.

We are just getting started and should have more info on the build over this weekend. The plan will be to show how we thought the easiest and best way to build this plane will be. I understand everyone will find easier ways but this is where we will start. I know this has been in the works since February but I truly believe that Sky Aviations wanted to do the right thing and that took some time. The kit comes with the standard accessories such as tank, wheels, horns, pushrods and motor mounts.

Todd Blose

In meinen Arrow baue ich folgende Komponenten ein:
Motor OS Max 61 VFR
Macs Krümmer
Novi Rossi 50042 Resorohr
APC 11 x 7 prop
TruTurn 2/12 Spinner
Futaba 16mz
Futaba S3071 HV Servos auf Quer und Höhe
Futaba S3102 auf Drossel
SkyAviations Einziehfahrwerk CP-2

Gewichte der Bauteile (Glühversion):

Fuse with top and crutch 737 Gramm.
Tragflächen links und rechts je 360 Gramm
Leitwerk links und rechts je 70 Gramm.

tood 1 01s

tood 1 02s

tood 1 03s

1.Oktober 2017
I have continued to be impressed by the quality of the components of this kit. Today I started on the installation of the aileron servos and electric retracts in the wing. I finished both the right and left wing panel and have enclosed pictures after completion and the bottom of the left panel prior to starting. The gear block and wheel well were pre-installed as was the aileron mount. The aileron servo and gear cutouts were very precise. The aileron cutout was sized for a standard size servo. Both were precise fits for the expected equipment. The kit is designed for the Sky Aviation electric set, and it is what I installed. The supplied wheels are 2.25” and fit the wheel well without a lot of excess room. It was a very simple installation and worked without any problems. Next I will get the wing joined and let you know how that was done.
tood 2 06s
tood 2 05s
tood 2 04s
tood 2 03s
tood 2 02s
tood 2 01s

 

2.Oktober 2017

Both panels have been completed and now they are ready to join. I installed the anti-rotation CF pins in one wing panel using 30 minepoxy and trial fit the wing halves together. The fit matches up very well and I will proceed to joining the panels using 30 min epoxy.

tood 3 01s

tood 3 02s

 

tood 3 03s

 

 

 

 

 

 

tood 3 04s

tood 3 05s

tood 3 06s

6.Oktober 2017
Motorträgerinstallation. (Neuer Motorspant und Motorträger wird in der Serienfertigung, basierend auf diesen Prototyp, für die Glühzünderversion gefertigt und beigelegt). 

Since the Arrow was originally developed for electric power, the firewall was sized and drilled for an electric motor. A new firewall was made corresponding to the height of the raised pipe deck. The kit included beam mounts for the engine, but I decided to use a Dave Brown 60/70 radial mount. I had to trim the bottom of the mount slightly to allow the mount to be in the proper location to allow the engine to be centered on the proper thrust line. The firewall was then glued to the fuselage with epoxy.

The Arrow pipe deck and firewall that is furnished is to be used with electric power and batteries and the glow version will its own version. In order to be able to install a tank and radio equipment, the deck needs to be raised enough to accomplish this and leave enough room for the pipe. I engaged in a trial and fit exercise to arrive at a good fit that should work. Final fit will be accomplished later in the process.

tood 4 01s

tood 4 02s

tood 4 03s

tood 4 04s

tood 4 05s

tood 4 06s

tood 4 07s

tood 4 08s

10. Oktober 2017
Folgende Arbeitsschritte werden zukünftig entfallen, die Rümpfe werden mit eingebauten Basiseinbauten serienmäßig geliefert.

The fuselage pipe deck / crutch is now installed. Danny and I had many conversations on the best way to not only install the crutch but also an easier way to get to the tank since its always been a pain to get the tanks in through the wing opening. We decided after measuring and trying to fit the available tanks, including the one that came with the kit, a tank hatch was the best option to install and remove the tank. The tank used is a Tettra 4051, 14 oz clunk tank. The Tettra 4061 bubbless tank would work as well. If a more conventional method of installing the tank through the radio compartment was utilized, the wing saddle flange and web would have required trimming to allow installation and removal of the tank. We were not sure if this would compromise the strength of the wing saddle, so we chose the tank hatch instead. The deck was sized to allow enough room for servos in the radio compartment and sufficient room for the pipe and cooling air clearance. After the glue set, all wood that could be exposed to fuel or oil was sealed with epoxy.

 todd 05 01s

todd 05 02s

todd 05 03s

todd 05 04s

todd 05 05s

todd 05 06s

todd 05 07s

todd 05 08s

todd 05 09s

todd 05 10s

todd 05 11s

todd 05 12s

todd 05 13s

11.Oktober 2017
Leitwerkseinbau.

The stab assembly is now installed on the fuselage. First, the stab tubes are cut to size from the included CF tube. Then the stab halves and tubes are trial fit to the fuselage. When satisfied, prep the stab root ribs, stab tubes, and fuse where the stab halves will attach by sanding all surfaces and cleaning with appropriate solvent. Then, a sufficient quantity of slow cure epoxy should be mixed. Brush the epoxy to the root of the stab halves, fuselage, and wing tubes. Assemble the parts, check the fit, and set aside.

todd 06 01s

todd 06 02s

todd 06 03s

12.Oktober 2017
Voila: Der erste fertige Glühzünder Arrow!

arrow todd 04s

arrow todd 03s

arrow todd 02s

arrow todd 01s

Schreibe einen Kommentar

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert